JMP-60 Truck Mounted Line Pump
- ACPA certified operator included
- WSIB clearance available
- Ontario owned since 1989
A line pump on a single truck rather than a truck and trailer. That one difference decides where it can go: driveways, laneways and yards where a towed combination has no room to swing round, and interior approaches where reversing a trailer would be the whole morning. It still pushes 64 m³/h at 88 bar, which is more output and more pressure than the trailer pump, from a truck about 8 metres long.
Other sizes in the fleet
The JMP-60 answers a specific and very common problem. You need a line pump, because there is no way to get a boom onto the site or open one once it is there. But the site also has no room to bring in a truck towing a trailer, get it turned around, and position it. On a narrow city driveway or a laneway build, that is most of the morning gone before any concrete moves.
This unit puts the pump on the truck. Roughly 8 metres overall, it drives in, sets up and pours as a single vehicle, and drives out the same way. No CDL is required to operate it, which makes dispatch more flexible than the machine’s size would suggest.
The capability is not a step down, either. 64 m³/h at 88 bar is more output and more delivery pressure than the towed BSA 1005, through a 180 by 1,000 mm hard chromed cylinder and a 5″ HD outlet. Maximum aggregate is 63 mm, so this is not a grout-only machine; it handles large aggregate concrete when the line is sized for it. The hopper holds 450 litres and the water tank 800.
Every booking includes an ACPA certified operator. Premier does not rent pumps as equipment only.
Typical applications: constrained residential driveways and laneways, basement and interior slabs, rear yard pours behind standing houses, infill lots, grout and specialist placements, and any line pump job where a trailer simply will not fit.
Figures below are taken from the Alliance JMP-60 manufacturer specification sheet. Note that although this unit is listed alongside the trailer pumps, it is truck mounted on a single chassis, not towed.
⚙️ Output and Pressure
| Output, rod side | 64 m³/h (83 yd³/h) |
| Pressure, rod side | 88 bar (1,276 psi) |
| Outlet | 127 mm (5″ HD) |
| S-tube size | 180 x 127 mm (7″ x 5″) |
| Maximum aggregate | 63 mm (2.5″) |
| Hopper capacity | 450 L (119 gal), easy clean |
🔧 Pump and Hydraulics
| Concrete cylinder | 180 x 1,000 mm (7″ x 39″), hard chromed |
| Hydraulic pump | Rexroth Hydromatic A11V0145 |
| Hydraulic pressure | 350 bar (5,076 psi) |
| Switching system | Hydraulic, with manual override |
| Lube system | Lincoln automatic greaser |
| Vibrator | Standard |
💧 Water and Controls
| Water tank | 800 L (211 gal) |
| Water pump | Hydraulic power, 20 bar (290 psi) |
| Radio remote | Wireless, with tethered backup remote |
| Tool box | Standard |
| Weight, as configured | 8,470 kg (18,673 lbs) |
| Licence | No CDL required |
🚛 On Site
| Overall length | Approx. 8 m (26’6″) |
| Configuration | Truck mounted, single chassis |
| Line sizes | 2″, 3″ and 4″ available |
| Setup | No trailer to position or reverse |
| Access | Driveways and laneways too tight for a combination |
| Operator | ACPA certified, included |
Weight is for the configuration Alliance shows on the sheet and varies with chassis and options; the overall length of roughly 8 m is Premier’s figure for the unit in service. Maximum pumping distance through line depends on the mix, line size, bends and vertical rise, so confirm it for your job rather than working from a headline number. Need the full manufacturer document for a submittal package? Download the Alliance spec sheet PDF.
- WSIB clearance certificate. Available on request for ICI and institutional prequalification packages.
- Daily equipment inspection. Completed before the unit leaves the yard, documented, and available if your safety officer asks.
- Lines, hoses and clamps for the configuration agreed at booking, including 2″, 3″, 4″ and 5″ line options.
- ACPA certified operator. Every Premier operator is trained and certified to American Concrete Pumping Association standards. The unit does not go out without one.
- Line sizing advice before you book. Line size, route and mix have to work together on any line pump job. Give us the mix design and the distance and we will tell you what the job needs.
- Wireless remote with a tethered backup. Standard on this unit, which matters on interior work where radio can be unreliable.
- Pre-pour site walkthrough on commercial and institutional jobs. On constrained residential work, send photos instead and we will do the same assessment from those.
- Unionized labour standards and OHSA compliance, as required on most commercial ICI sites.
Fuel, washout facilities and site access are the contractor’s responsibility unless agreed otherwise in writing at booking.
This unit exists to reduce site requirements, so the list is shorter than for anything else in the fleet. The line route is still the thing that decides how the day goes.
- Vehicle access. Roughly 8 metres of truck, arriving and leaving as one vehicle. If a standard flatbed can get in and out, so can this. No space is needed to unhitch or reverse a trailer.
- Pump position. It has to sit where a ready-mix truck can discharge into the hopper, with room for the mixer to get in and back out. That is usually the binding constraint, not the placement point.
- The line route. Plan where the line runs, what it crosses, how it is supported and who moves it during the pour. Bends cost pressure and vertical rise costs a great deal more.
- Ground. 8,470 kg on a single truck, so ground bearing is rarely the constraint. Level footing still matters.
- Interior work. This is a diesel truck, so an enclosed pour needs ventilation, or the electric BSA 1005 E instead. Raise it early rather than on pour morning.
- Washout. Both the pump and the full line have to be washed out. Nominate the location before the pour. Premier does not wash out to grade or to drains.
Our guide to safe hose routing covers line layout, and preventing line blockages covers what goes wrong when it is rushed.
Is the JMP-60 the Right Pump for Your Pour?
Specify this unit when
- Sites with no room to manoeuvre a truck and trailer combination: narrow driveways, laneways, small yards
- Basement and interior slabs where the concrete has to travel through line but access is too tight to tow a pump in
- Residential infill, where the pump has to park on the street and the pour is behind the house
- Grout, small-volume and specialist placements on constrained properties
- Jobs where setup time matters and reversing a trailer into position would cost half an hour
- Anything from grout to large aggregate concrete, with line sized to the mix
Use a different unit when
- Large open-site pours. A boom pump places more than twice as fast with no line to lay
- Work at height. There is no boom; the concrete goes where the line goes
- Very long runs at high volume, where the BSA 1005 can be positioned closer to the pour and the truck sent away
- Stone, gravel or fill. That is a telebelt job
- Pours where nobody has planned the line route. That is the one thing that reliably costs a line pump job its morning
How It Compares to the Units Either Side
| Unit | Output | Pressure | Arrives as |
|---|---|---|---|
| Alliance JMP-60 (this unit) | 64 m³/h | 88 bar | One truck, roughly 8 m. No trailer to position |
| Putzmeister BSA 1005 | 52 m³/h | 70 bar | Truck and trailer. The trailer can be placed closer to the pour |
| 32m boom pump | 164 m³/h | 72 bar | One truck, but needs 7.5 m of clear ground to set up |
The two line pumps do much the same work. Choose between them on access: if there is room for a combination and the pump wants to sit close to the pour, take the trailer. If there is not, take this one.
Where the JMP-60 Earns Its Place
Premier describes this one as the do-it-all machine, and on constrained residential and light commercial work that is close to true. It goes to the jobs where a line pump is clearly the right tool but the site cannot take the usual arrangement: a narrow city driveway, a laneway build, a rear yard reached down the side of a standing house, an interior approach where reversing a trailer is simply not on.
Being truck mounted also means it arrives, sets up and leaves as one thing. There is no unhitching, no positioning the trailer by hand, no tow vehicle occupying a parking space for the day. And because no CDL is required to drive it, dispatch is more flexible than the size of the machine suggests. Output is 64 m³/h at 88 bar, both higher than the towed unit, so you are not giving up capability for the convenience. Before you book, boom pump versus line pump is the right read, and how far a line pump can push concrete sets expectations on distance.
Frequently Asked Questions, JMP-60
Is the JMP-60 a trailer pump?
No, and it is worth being clear about because it is often listed alongside them. It is a line pump mounted on a single truck, roughly 8 metres overall. It arrives, sets up and leaves as one vehicle. If you specifically need a pump that can be unhitched and positioned away from the truck, that is the BSA 1005.
How much concrete can it place?
64 m³/h, or about 83 cubic yards an hour, at 88 bar of delivery pressure. That is more than the towed trailer pump on both counts. Real world rate depends on the line size, the run and the mix, but for a machine this size the output is not the limiting factor most people expect.
What size aggregate can it handle?
Up to 63 mm, two and a half inches, so it is not restricted to grout and fine mixes. It runs a 180 by 1,000 mm hard chromed cylinder and a 5″ HD outlet, with 2″, 3″ and 4″ line available. Line size gets chosen against the aggregate and the distance.
Do you need a special licence to bring it to site?
No CDL is required for this unit, which is one of the practical reasons it gets dispatched quickly. It still goes out with an ACPA certified operator; Premier does not rent pumps as equipment only.
Will it fit down my driveway?
Usually, if a standard flatbed truck would. It is roughly 8 metres long and needs no room to unhitch or reverse a trailer. The real question is normally where the ready-mix truck stands to discharge into the hopper, not where the pump goes. Send a photo of the driveway and the street and we will tell you before you book.
Should I book this or a boom pump?
If a boom pump can get onto the site and open, book the boom. It places more than twice as fast and there is no line to lay, support or wash out. This unit is for when it cannot: no clearance, no room, no ground, or the pour is inside a structure. We would rather tell you the boom fits than sell you the line pump.
Popular Equipment
The units Ontario contractors book most often, alongside this one.

BSA 1005 Trailer Pump
The towed alternative. Positions closer to the pour when the site has room for the combination.

32m Alliance ZZ
The smallest boom in the fleet. If it fits, it places far faster with no line to lay.

Telebelt TB 130
For stone, gravel and fill, which no pump can move, and for low clearance placement.
Check Availability for the JMP-60